Please wait...

BLACK FRIDAY OFFER

BLACK FRIDAY SALE
Paw ID QR code dog tag in multiple colours

Paw ID QR code dog tag - Original

£14.99

save £10

was £24.99

In stock - Free UK Delivery!

Choose your colour

Free UK Delivery

30-days return policy

Secure Checkout

  • Apple Pay
  • Google Pay
  • Maestro
  • Mastercard
  • Visa
  • PayPal

Delivery

On or before Wed 03 Dec

Free

Express - Tue 02 Dec

£2.95

Overview

The UK's Smartest Pet Tag

Paw ID is the leading QR code pet tag trusted by thousands of UK pet owners. With no monthly fees, just a one-time £14.99 purchase, you get lifetime access to powerful features that help reunite lost pets fast. Built tough with a metal ring and epoxy seal, it’s waterproof, secure, and smart. Real-time notifications, scan location history, and privacy-first contact options give you peace of mind wherever your pet goes.

Dimensions

  • Tag diameter: 33mm
  • Thickness: 2.5mm
  • Weight: 10 grams
  • Material: Metal with epoxy resin seal
  • Colour options: Original, Black, Blue, Green, Pink
  • Fits all standard pet collars (small, medium, large)

Features

  • No subscription – one-time purchase, lifetime access
  • Instant email alerts when tag is scanned
  • Scan history with map tracking
  • Privacy-first contact form to keep your details hidden
  • Lost pet mode – alert nearby users and generate flyer
  • Notify nearby vets & shelters when pet is marked as lost
  • Pet profile – add microchip, vet info, allergies, and more
  • Photo gallery – 4 public images (unlimited with Premium)
  • Add 2 contacts (unlimited with Premium)
  • Upload documents with expiry reminders
  • Half-price replacements (free with Premium)
  • Waterproof & durable epoxy-sealed metal tag

Rated the best QR pet tag by pet owners!

Susan Perry

23/07/2025
Paw ID Trustpilot Reviews 5 Stars

Tags are well made. Came very quickly, web site free subscription! But basic information wanted. Pretty tags .

Mr & Mrs Hutchings

22/06/2025
Paw ID Trustpilot Reviews 5 Stars

Really pleased with our pawid, arrived very quickly and was really easy to set up

MRSLISAMAXWELL

17/06/2025
Paw ID Trustpilot Reviews 5 Stars

Very easy to use

Tracy

07/06/2025
Paw ID Trustpilot Reviews 5 Stars

It’s peace of mind knowing that having a microchip and a tag that scans is great, to help keep your dog even more traceable if ever lost.

Vix

26/05/2025
Paw ID Trustpilot Reviews 5 Stars

Great and easy to set up much better than a stamped tag.

Linda

23/05/2025
Paw ID Trustpilot Reviews 5 Stars

Had a little trouble registering the tag but was resolved via online chat quickly

Lorraine

06/03/2025
Paw ID Trustpilot Reviews 5 Stars

I have 2 tags and they are robust and eye catching. It is such peace of mind that someone can scan the tag and all your vital information is in one place. I lost one of the tags after months and Dom,the founder, couldn't have been more helpful and responsive. Fantastic Company

Jan

05/03/2025
Paw ID Trustpilot Reviews 5 Stars

The tag arrived next day. Good quality, heavy construction. Impressed that there is no monthly subscription after the initial outlay. Linking tag with phone was easy, and it worked immediately when scanned, showing a precise location.

Emily

25/01/2025
Paw ID Trustpilot Reviews 5 Stars

Really love the tag, well made when scanned it sends an email too easy to upload everything on to had no issues at all

Carly

12/12/2024
Paw ID Trustpilot Reviews 5 Stars

PawID have given us the peace of mind that if we ever lost our dog he would be safe. We are thrilled with his new tag. We have trialed this by scanning the tag and we got all the notifications needed.

JAYNE

04/12/2024
Paw ID Trustpilot Reviews 5 Stars

An easy service to use, with prompt delivery of my pet disc. The service offers peace of mind regarding the safety of my pet.

Catherine

27/11/2024
Paw ID Trustpilot Reviews 5 Stars

Good very good better than just micro chipping as anyone can get your details.

Paul

15/11/2024
Paw ID Trustpilot Reviews 5 Stars

Very straightforward to set up and enter all my pet's details. And then that's it, hopefully I'll never need to think any more about it!

Wendy

23/09/2024
Paw ID Trustpilot Reviews 5 Stars

Very pleased with dog tags, took longer to arrive than I was expecting but worth the wait

Paul

01/10/2024
Paw ID Trustpilot Reviews 5 Stars

Very simple process - order a tag in the colour you want, get it fast and then fill in the details of your dog. Couldn't be easier.

Mrs R Brown

14/09/2024
Paw ID Trustpilot Reviews 5 Stars

Ordered replacement tag as our dog had lost our original one. Had a problem with the transferring of our details onto new tag. Contacted them via email and within five minutes Dom came back and said he would sort it out and a couple of hours later he confirmed it was all set. Great product and excellent customer service.

Segolenne

28/08/2024
Paw ID Trustpilot Reviews 5 Stars

The app also didn’t allow international address and Pawid even changed their platform to allow us to add an international address in record time. Would highly recommend.

Claudia

09/08/2024
Paw ID Trustpilot Reviews 5 Stars

My items arrived really fast and were super easy to set up. No monthly subscriptions which I found on other sites. Can put lots of information on your and/or your pets profile and you get an email when someone scans the tags and from what location.

Anne

23/06/2024
Paw ID Trustpilot Reviews 5 Stars

Easy to purchase (one time payment no membership), fast delivery and super easy to set up. Although I hope I never have to use it, the profile is easy to view and you get an instant email saying it’s been scanned and the location.

Mikeyc

13/05/2024
Paw ID Trustpilot Reviews 5 Stars

Easy to order,fast delivery,easy to register your pet. My sister and brother in law scanned my dogs take and loved the fact it brings up all the information needed on his profile.

Amanda

02/05/2024
Paw ID Trustpilot Reviews 5 Stars

I love there's no subscription. It looks good and when I tested it, it's accurate in location, and it sent me an email to tell me to login, to see where my dog was. I'm impressed. Great price too. I've recommended to a few friends!

PJ

19/02/2024
Paw ID Trustpilot Reviews 5 Stars

Received next day and set up within minutes. I feel just that little bit more confident that the best and furriest member of our family will be kept safe.

Morgan

30/12/2023
Paw ID Trustpilot Reviews 5 Stars

Absolutely love my new tag! I had a question about my order and pawid emailed back within an hour! Amazing customer service and the guys are very helpful and lovely! Also amazing quality! Thank you so much for my tag!

DC

13/12/2023
Paw ID Trustpilot Reviews 5 Stars

These collars are such great quality and look amazing! There was a misunderstanding with my order and the customer service was amazing at getting back to me! Highly recommend this business :)

Jennifer

11/12/2023
Paw ID Trustpilot Reviews 5 Stars

Brilliant! Absolutely love it! You just pay for the tags and there's no subscription fee unlike other some other companies.

Greg

11/12/2023
Paw ID Trustpilot Reviews 5 Stars

Absolutely brilliant idea and a brilliant tag I've shown a few of my friends with dogs and there ording them as well

Mercedes

11/12/2023
Paw ID Trustpilot Reviews 5 Stars

Quick delivery and super easy to set up. Really happy with the PawId tag. Customer service is helpful and responsive

Luca

12/11/2023
Paw ID Trustpilot Reviews 5 Stars

Much better than the old style collar tags. Can add multiple contacts and more vital information.

Just

05/11/2023
Paw ID Trustpilot Reviews 5 Stars

Absolute Gamechanger! Dispatched the same day, arrived next midday. Very easy to set up and get started!

Janine

22/10/2023
Paw ID Trustpilot Reviews 5 Stars

Scanned to check it works and all good.

Catherine

16/09/2023
Paw ID Trustpilot Reviews 5 Stars

Quick and easy ordering and easy to add information online

Julie

12/09/2023
Paw ID Trustpilot Reviews 5 Stars

Easy to order, the tag came really quick. Easy to set up. I think this is a great idea.

Ben

09/09/2023
Paw ID Trustpilot Reviews 5 Stars

Fast Delivery and Good Service

Catherine

22/08/2023
Paw ID Trustpilot Reviews 5 Stars

Quick efficency from ordering to delivery

Cleanastic

21/08/2023
Paw ID Trustpilot Reviews 5 Stars

My dog loves it. Easy to use and gives me a piece of mind.

Amanda

12/02/2023
Paw ID Trustpilot Reviews 5 Stars

Great product! Easy to use. Works well. Good value for money.

No subscription

Pay once and enjoy lifetime access with no hidden fees or recurring costs.

Instant access pet profile

Finders can scan the tag to see your pet’s profile, including medical and contact details.

Real-Time notification

Get immediate alerts whenever someone scans the tag, so you’re always in the know.

Durable and Waterproof

Built to withstand any adventure – from playful pups to outdoor-loving cats.

Compatible with Any Device

Easily scanned by any smartphone or device, no app download required.

Peace of Mind for Life

Simple, effective protection to ensure your pet always comes home safe.

Paw ID digital pet profile for Brownie, showing detailed information including age, gender, weight, microchip number, description, allergies, and favourite food.

Online Digital Pet Profile

Every Paw ID digital pet tag comes with a secure online pet profile where you can store all the important details about your pet in one place. From their name, age, and breed to medical history, allergies, behaviour notes, microchip number and vet information, everything is easily accessible. When someone scans your pet’s QR tag, they’ll only see the details you’ve chosen to share, helping them act quickly and responsibly if your pet is found. This makes your Paw ID tag far more versatile and effective than a standard engraved tag.

Paw ID pet profile showing multiple contact details for a dog named Brownie, including email addresses, phone numbers, and addresses, with options to edit or delete each contact.

Add Multiple Contact Details

Make sure your pet can always find their way home by adding the contact details of family, friends, neighbours, or your vet. Free members can store up to 2 contacts, while Premium subscribers can add unlimited contacts for complete peace of mind. Each person you add will automatically receive a real-time email notification whenever your pet’s tag is scanned, so everyone stays informed instantly. You’re also in full control of privacy. Choose which details to display publicly and keep the rest hidden, while still allowing finders to contact you securely through Paw ID.

Mobile phone lock screen displaying a Paw ID push notification that someone has scanned Brownie’s tag.

Instant Email and SMS Notification

Whenever your pet’s tag is scanned, you’ll receive an instant email alert, showing you exactly when and where the scan took place. Premium members also get real-time SMS notifications for even faster updates. Whether you’re at work, travelling, or simply away from home, you’ll know immediately when someone has found your pet. These smart alerts make Paw ID a next-generation solution designed to reunite pets and their owners as quickly and safely as possible.

Map interface highlighting nearby vets and animal shelters with contact details and photos, indicating locations notified when a pet is reported missing.

Vet and Shelter Notifications

If your pet ever goes missing, Paw ID can instantly notify local vets and animal shelters with your pet’s complete profile, including their photo, name, medical requirements and your contact details. This ensures professionals have all the information they need to help bring your furry friend home quickly and safely.

Paw ID pet profile with contact and pet details blurred out behind a red privacy padlock icon, demonstrating the privacy mode feature.

Privacy Mode

Unlike traditional pet tags, our QR code tags give you full control over your privacy. You can choose to hide sensitive information such as your pet's name, your phone number or address, while still allowing anyone who finds your pet to contact you securely via our online form. This means your digital pet tag keeps your personal details protected, while ensuring you remain easily reachable in an emergency, giving you total peace of mind.

Paw ID pet profile documents tab showing uploaded records such as vaccinations, passport, vet visits, and insurance, with expiry dates and download options.

Upload Important Documents and Set Expiry Reminders

With Paw ID Premium you can keep all your pet’s essential paperwork organised and accessible in one secure place. Upload documents such as vaccination records, insurance policies, medical certificates, adoption papers, or any other important files directly to your pet’s profile.

To help you stay on top of your pet’s care, you can also set expiry reminders for each document. Whether it’s a vaccination due date, insurance renewal, or a routine vet check-up, Paw ID will send you a timely notification before anything expires or needs updating.

Paw ID pet profile displaying a photo gallery of Brownie the toy poodle, with multiple images arranged in a grid layout.

Create and Organise your Pet’s Gallery

With Paw ID, you can build a personalised gallery to showcase your pet’s best moments. Upload photos to celebrate their adventures, milestones, or simply capture their unique personality.

You can organise images into folders and choose whether each picture is public or private, giving you complete control over what you share. Public photos can be seen by anyone who scans your pet’s QR tag, helping them quickly identify your pet if they’re found.

Premium members enjoy unlimited uploads and private albums, while all users can keep a selection of favourite photos visible on their pet’s profile.

From their very first day home to their latest trip to the park, your pet’s gallery is the perfect way to keep memories safe, organised, and easy to share.

How does it work?

Read the QR code with your smartphone!

Register or sign in to the Paw ID application!

Upload pictures and information about your pet!

Test Paw ID QR Code Dog Tag
Feature Paw ID Qr Code Dog Tag Logo Other tags
Monthly Cost

Not required

From £2.99/month

Tag Material

Epoxy with metal ring

Plastic

Delivery cost

FREE

£2.95

Unlimited scan history
Documents Upload
Expiring Document Notification
Pet gallery with folders
Partner discounts
Lost pet flyer
Multiple colours

Our Partners

Zooplus.co.uk

Zooplus.co.uk

zooplus.co.uk is the UK's leading online retailer of pet supplies and Europe's largest online pet shop

Visit Zooplus.co.uk
Buddy and Lola

Buddy and Lola

Dog supplements that work! Highly Effective Supplements for Targeted Support Also available in Pets at Home.

Visit Buddy and Lola
Pooch and Mutt

Pooch and Mutt

Natural ingredients. Approved by vets for dogs so we can give you peace of mind that you're doing right by your pooch, helping them live their best dog life.

Visit Pooch and Mutt
Doggy Vits

Doggy Vits

Your all-in-one dog supplement. Vet formulated. A Doggy Vits a day for more Woof, Wag and Play!

Visit Doggy Vits

Latest Blog Posts

Back Garden Safety: The Ultimate UK Guide to Keeping Pets Secure Outdoors

Dom

November 28, 2025

Back Garden Safety: The Ultimate UK Guide to Keeping Pets Secure Outdoors

Read article
Lost Pet Action Plan: How to Organise a Speedy Search in the UK

Dom

November 26, 2025

Lost Pet Action Plan: How to Organise a Speedy Search in the UK

Read article
Top Cat and Pet Comfort Picks for 2025: Cosy Beds, Healthy Foods & Clever Solutions

Dom

November 25, 2025

Top Cat and Pet Comfort Picks for 2025: Cosy Beds, Healthy Foods & Clever Solutions

Read article

FAQs

What is a QR code dog tag?

A QR code dog tag is a digital pet ID that uses QR code technology. By scanning the tag with a smartphone, it links to a web page with comprehensive details about your pet. Our QR code dog tag offers limitless, updatable information about your pet, providing an efficient and modern solution for pet safety.

Is this a GPS tracker?

No – Paw ID is not a GPS tracker. Instead, when someone scans your pet’s tag, you receive an instant email notification with the location of the scan, and the finder can contact you securely. It’s a smart digital alternative that works without batteries or subscriptions.

What if my dog never runs away?

We hope you never need it – but accidents happen: a gate left open, a dropped lead, a loud noise causing panic. Paw ID is designed for the “just in case” moment, giving you peace of mind in case your pet ever goes missing.

Is Paw ID better than other QR pet tags?

Yes – Paw ID launched in early 2019 in the UK, before most other options like Crumb. We offer more value: scan location history, privacy controls, document expiry reminders, image gallery, without any required subscriptions.

What are the benefits of using QR code dog tags over microchipping?

While microchips are important and we encourage them, usually only vets carry the right tools to scan them (RFID scanners). Paw ID allows anyone with a smart phone to access your pets information. Microchips also do not have half the available features as a Paw ID tags such as our live alert system.

How does the QR code dog tag work?

Our QR code dog tag works by encoding your pet's unique ID into a scannable QR code. When the pet id tag code is scanned using a smartphone or a QR code reader, it directs the user to a personalised web page that houses detailed information about your pet. This provides a quick, accessible way for someone to help your pet if it's lost, promoting safety and peace of mind.

Is this legal in the UK?

By UK law, dogs must wear a tag with the owner’s name and address in public. Paw ID is not a replacement for the legal tag, but a powerful addition – offering scan alerts, medical notes, photo gallery, and more, all in one place.

Do I need to pay a subscription fee for Paw ID QR code dog tags?

No, Paw ID dog tags are a one-time purchase. Once you buy your QR code dog tag, you'll have lifetime access without any monthly subscription fees.

What should I do if my pet’s Paw ID QR code tag gets damaged or lost?

If your Paw ID tag becomes damaged or lost, you can simply order a replacement tag through your Paw ID account. Your pet’s existing information stays intact, making it quick and easy to activate the new tag.

Can I update my pet's information after activating the Paw ID QR code tag?

Absolutely! You can update or edit your pet’s information at any time by logging into your Paw ID account. Changes are reflected immediately whenever the QR code is scanned.

Do I receive notifications when someone scans my pet’s QR code?

Yes, Paw ID has a live alert feature that immediately notifies you whenever someone scans your pet’s QR code. If location sharing is permitted, you’ll also receive the approximate location of the scan, helping you quickly locate your pet.

Is my personal information protected when using Paw ID tags?

Yes. Paw ID includes advanced privacy controls that allow you to choose exactly what information you wish to make visible when someone scans your pet’s QR tag. Your sensitive personal data remains protected and securely stored.

Can I transfer my Paw ID QR code tag to another pet?

Paw ID tags are unique to each pet’s profile to maintain accuracy and reliability. If you have another pet, we recommend getting a new QR code tag for accurate identification and record-keeping.

Does Paw ID work internationally if I travel with my pet?

Yes, Paw ID QR code dog tags can be scanned globally. Wherever you travel, your pet’s information will always be accessible, making it especially useful during international trips.

What information can I include on my pet’s Paw ID profile?

You can add comprehensive details including your pet’s name, breed, age, medical history, vaccination records, dietary needs, behaviour notes, emergency contacts, and even your veterinarian's information.

Can Paw ID QR code tags be used for animals other than dogs?

Absolutely! While often referred to as "dog tags," Paw ID tags can effectively be used for cats, rabbits, horses, or any pet you wish to safeguard.

Are Paw ID tags suitable for puppies and kittens?

Yes, Paw ID QR tags are suitable for pets of all ages. In fact, they’re particularly beneficial for younger animals, providing essential information like vaccination status, owner contact details, and emergency care requirements.

Does the Paw ID QR code require batteries or charging?

No batteries or charging are necessary. Paw ID QR codes function without power, ensuring they always work when scanned with a smartphone.

Can more than one person receive scan alerts for my pet’s Paw ID tag?

Yes, Paw ID supports multiple recipients for scan notifications. You can easily add family members or pet carers to your Paw ID account to ensure everyone stays informed.

How quickly can someone contact me once the QR code is scanned?

Once the QR code is scanned, your contact details appear immediately, allowing the person who found your pet to call, message, or email you instantly.

Is it difficult to set up a Paw ID QR code dog tag?

No, setup is straightforward and quick. After purchasing your tag, simply activate it by scanning the QR code and entering your pet’s information into the Paw ID platform. Setup usually takes less than 5 minutes.

Are QR code dog tags safe and secure?

Yes, QR code dog tags like Paw ID are safe and secure. The QR code only links to the information you choose to share, and any sensitive data is securely stored. Paw ID respects your privacy, ensuring only necessary information is accessible when the QR code is scanned.

Is Paw ID QR code dog tag durable?

Absolutely, our QR code dog tags are designed with durability in mind. They're made from sturdy materials like stainless steel or toughened plastic, designed to withstand the active lifestyle of your pet. The QR code is also printed in a manner to resist fading or damage, ensuring it remains scannable over time.

Can all smartphones scan QR code dog tags?

Yes, all modern smartphones can scan QR code dog tags like Paw ID. Both Android and iOS devices come with built-in QR code readers in their camera apps. This makes accessing the information stored in the QR code as easy as taking a photo, ensuring a broad accessibility for anyone who finds your pet.

How can a QR code on a dog tag help in case my pet gets lost?

Our QR code dog tag provides immediate access to your pet's essential information when scanned. It can display your contact details, pet's medical needs, and more, assisting in the quick and safe return of your lost pet. The ease of scanning a QR code with a smartphone facilitates immediate communication with the pet's owner.

What is the lifetime of a QR code on a dog tag?

The lifetime of our QR code dog tag is virtually limitless. The physical tag is made from durable materials to resist wear and tear. The associated online data can be updated as needed, ensuring the tag remains relevant throughout your pet's life.

Can a QR code dog tag store medical information about my pet?

Yes, our QR code tag can store and provide access to your pet's medical information. This includes details like allergies, dietary restrictions, ongoing treatments, and medications. With this information readily accessible through the QR code, it can ensure your pet receives the appropriate care, particularly in emergency situations.

Contact Us

Got questions or need assistance? We're here to help!
Contact the Paw ID team today. Our dedicated customer service is committed to providing swift and effective solutions tailored to your needs.

or